Setting up the Project synchronization scheduled task
On the Task Scheduler settings tab, click +Add schedule, and then Import projects from CSV. The properties panel of the new synchronization opens on the right side of the screen.
On the panel, set up the schedule, as described in Task Scheduler.
In the File section, browse and select the CSV file (the file should be stored on the MyQ server).
Click Save.